
All England Lawn Tennis Club, Wimbledon
Groundworks & Hard landscaping within the All England Lawn Tennis Club Campus in Wimbledon, the works…
Services:
Groundworks & Hard landscaping within the All England Lawn Tennis Club Campus in Wimbledon, the works…
Construction of 2m deep strip foundations and ground floor slab to include all drainage and holding down…
Installation of all foul and storm drainage site wide. Foul water diversion to install new foul run to the…
The site is located within the University of Oxford, at the prestigious Old Campus Road. The new amenities…
1 Liverpool Street Development is an Over Station Development (OSD) and consists of a new build commercial…
Works include the breaking out and construction of new lift and sump pit bases at basement level in addition…
Realtime were appointed by Sir Robert McAlpine to carry out the enabling works for the installation of a…
Construction of concrete curved planters and the installation of finishes. Resin bound pathways and kerbs…
Panorama St Paul’s at 81 Newgate Street is a mixed-use development in the City of London EC2. The scheme…
A variety of landscaping works to External Terraces from Level 1 to 9, as well as hard landscaping to GF…
Realtime Civil Engineering Ltd.’s scope of Works for this Package covers the design, procurement, and…
Realtime Civil Engineering worked on the Grade II listed Shaftesbury Theatre to improve the visual connectivity…
Installation of the Residents Multi Use Games Area inclusive of visual concrete retaining wall, drainage,…
A 4-level basement and 9 story structure above ground. Works involved the construction of a waterproof SRC…
Works involved the lowering of the existing basement to both the North and South buildings. Construction…
Salvage of hard landscaping materials, limited demolition & alterations (of RC and Brickwork elements…
Realtime civil engineering worked on the culturally significant structure of Mausoleum at Highgate Cemetery…
Realtime were appointed in 2013 by Craig Hamilton Architecture to undertake the site clearance, substructure…
Works involved Construction of a single basement with a 2 storey RC frame within St Bart’s Hospital…