Westbury Hotel, London
Contract Summary
Realtime Civil Engineering Ltd.’s scope of Works for this Package covers the design, procurement, and installation of:
- Demolition of the B1 slab to facilitate, reinforced concrete foundations, pile caps and lift pits with associated groundworks and excavations and blinding layer.
- Formation of the B2 basement slab inclusive of; waterproofing membrane, cavity drain, and concrete topping slab.
- Detailed design of the basement waterproofing system in line with the design intent information provided by the Client’s Consultants.
Concrete liner walls to the entire B2 perimeter. - Design and installation of the piling matt and subsequent attendances to maintain piling activities.
- Capping beams to the secant pile wall (by Keller Piling) to suit construction details.
- Installation of reinforced concrete slabs to Comfloor decking from levels B1 to roof.
- Construction of a raft foundation to the proposed external plant tower located in the SE corner of the building.
- Construction stairs within all the stair cores.
Contract in Brief
Market Sector: Hotel
Scope of Works: Substructure, Superstructure
Main Contractor: Sir Robert McAlpine
Engineer: Ramboll
Architect: Morrison Design
Duration: 73 weeks
Value: £5.25m
Contract Start Date: October 2021