Home>Case Studies>AZ SOB Enabling

AZ SOB Enabling

Contract Summary

Installation of all foul and storm drainage site wide.

Foul water diversion to install new foul run to the external elevation of the SOB.

Installation of service corridors to North and South central zone.

Construction of MUGA and swale areas to include granite paving and landscaping.

Installation of piling platform to the SOB (South Office Building).

Installation of hard standing to the external areas of SOB for logistics during construction works.

Contract in Brief

Market Sector: Commercial

Scope of Works: Enabling Works

Main Contractor: MACE Ltd

Engineer: Arups

Architect: TBC

Duration: 32 weeks

Value: £5m

Contract Start Date: July 2024