Wimbledon AELTC

Contract summary

Installation of concrete pile cap foundations & RC Super-columns to support the steel work for the new roof on court number 1.

Structural alterations to facilitate large diameter piling operations for super column pile caps, works required breaking out the existing slabs, drainage diversions, demolition of existing walls and suspended ceilings. Protection of existing works and surround environment.

 Re-instatement of the same finishes with new materials of existing walls, stairs etc. once works completed.

 Due to the sensitive location of the site RCE had to ensure that a minimum amount of disruption was caused to the neighbouring properties.

 

 

Contract in Brief
  • Market sector
  • Scope of worksSubstructure
  • Main contractorSir Robert McAlpine Ltd
  • EngineerThornton Tomasetti
  • ArchitectKSS
  • Duration18 weeks
  • Value£1.5m
  • Contract start dateJanuary 2016