Battersea Dogs & Cats Home, London

Contract summary

Construction of an 8 storey RC frame office block.

The works consisted of excavation, Temporary works, drainage, concrete, formwork, reinforcement and installation of Grade 3 waterproofing system.

Sub-structure drainage to basement location.

Installation of reinforced concrete cores to stair wells and lifts. Installation of concrete up-stands and plant bases to superstructure floors and roof.

Realtime were also awarded the hard landscaping works which consisted of permeable block paving to the perimeter of the building.

 

Contract in Brief
  • Market sector
  • Scope of worksSubstructure, Superstructure & Hard landscaping
  • Main contractorSir Robert McAlpine Ltd
  • EngineerFluid
  • ArchitectJonathan Clark
  • Duration52 weeks
  • Value£3.7m
  • Contract start dateOctober 2015